122 Nicholson Street, Orbost, VIC 3888 - P: (03) 5154 1919
Monday, July 20, 2026
Snowy River Mail
  • Home
  • News
    • Local News
    • Sport
    • Primary Producer
  • Services
    • Order Newspaper Photos
    • Print Your Photos
    • Commercial Printing
  • Our Publications
    • Features
    • Bairnsdale Advertiser
    • Lakes Post
    • East Gippsland News Weekend
    • Lakes Coast Visitor Guide
    • Great Alpine Road Guide
    • Sapphire Coast
    • Home & Lifestyle
  • Advertising / Contact
    • Display Advertising
    • Classifieds Advertising
    • Trades & Services
    • Submit a News Story
    • Thumbs Up / Thumbs Down
    • Advertise on our Website
    • About
    • Contact
  • Read Our Newspapers
No Result
View All Result
  • Home
  • News
    • Local News
    • Sport
    • Primary Producer
  • Services
    • Order Newspaper Photos
    • Print Your Photos
    • Commercial Printing
  • Our Publications
    • Features
    • Bairnsdale Advertiser
    • Lakes Post
    • East Gippsland News Weekend
    • Lakes Coast Visitor Guide
    • Great Alpine Road Guide
    • Sapphire Coast
    • Home & Lifestyle
  • Advertising / Contact
    • Display Advertising
    • Classifieds Advertising
    • Trades & Services
    • Submit a News Story
    • Thumbs Up / Thumbs Down
    • Advertise on our Website
    • About
    • Contact
  • Read Our Newspapers
No Result
View All Result
Snowy River Mail
No Result
View All Result
Home News Local News

Brace yourself for even worse roads

by Snowy River Mail
29 July 2024
in Local News

It is hard to believe our roads can get any worse – but they will – there is no other possible outcome.

The State Government’s own assessment found a staggering 91 per cent of our roads are in “poor or very poor” condition. So, did Jacinta Allan respond to this revelation?

Figures released by Roads Minister, Melissa Horne, show resurfacing spending dropped from $201.4 million in 2022/23 to $37.6 million in 2023/24.

This 81 per cent cut in funding to resurface roads on top of their already poor condition, can only ever end one way – even worse conditions.

In addition to this, road maintenance funding (the money used to fill potholes and make temporary repairs) is less than it was in 2020 after a 45 per cent cut in that year.

Australian Community Media, which completed some additional research, revealed repairs dropped from more than nine million square metres in 2022/23 to just 343,000 square metres in 2023/24 – a 96 per cent decrease.

Some of this can be attributed to the northern Victorian flood response, but with a raft of signs on our roads warning us to slow down due to a “rough surface ahead” or “road hazard ahead”, the funding needed to be sustained rather than obliterated.

Interestingly, in the state’s own assessment, not one road was listed as “good” or “very good”, with the remaining nine per cent only listed as “fair”.

The National Transport Research Organisation (NTRO) conducted the survey for the Department of Transport across the state’s road network.

The survey was undertaken using the NTRO’s iPAVE technology and was spruiked by the Labor Government in January last year as “world-first”, despite having been used by other states for years.

The state has argued that unprecedented wet weather is a contributor, but this is not accurate and a poor excuse. The survey listed only 707kms of road as flood affected and, apart from the northern Victorian floods, Bureau data shows the weather has been largely average over recent years.

The real reason is simply this. Labor can’t manage money, can’t manage projects and its Victorian motorists who are paying the price. The roads budget has been decimated to service an increasing debt ($25 million per day in interest alone) and build a rail line worth $220 billion in Melbourne that we were told would cost $50 billion.

Only the Liberals and Nationals will provide the investment our country roads need, as committed to last election with a promise of $10 billion over 10 years.

ShareTweet
Previous Post

“A” grade back in the top four

Next Post

Deer hunting popular

Next Post
Deer hunting popular

Deer hunting popular

Trending

Mallacoota Flatty Classic is back

Mallacoota Flatty Classic is back

15 July 2026
Boundary tree help requested

Boundary tree help requested

11 June 2024
Hooks ready

Hooks ready

13 July 2026
Most innovative region

Most innovative region

13 July 2026
A fabulous feast at Dunetown

A fabulous feast at Dunetown

16 July 2026
Smart window styling for local homes

Smart window styling for local homes

18 July 2026

Popular Stories

Heavy vehicle blitz
Local News

Heavy vehicle blitz

29 June 2026
Local News

Strong showing for East Gippsland in Victorian Rural Health Awards

22 June 2026
Hope for historic icon
Local News

Hope for historic icon

4 July 2026
Marlo upgrade nears completion
Local News

Marlo upgrade nears completion

2 July 2026

Snowy River Mail

122 Nicholson Street
PO Box 272
Orbost, VIC 3888

P: (03) 5154 1919
F: (03) 5154 2099

Publication Day: Wednesday
Circulation: 3,531

James Yeates

65 Macleod Street
PO Box 465
Bairnsdale, VIC 3875

P: (03) 5152 4141
F: (03) 5152 6257

© 2024 James Yeates

No Result
View All Result
  • Home
  • News
    • Local News
    • Sport
    • Primary Producer
  • Services
    • Order Newspaper Photos
    • Print Your Photos
    • Commercial Printing
  • Our Publications
    • Features
    • Bairnsdale Advertiser
    • Lakes Post
    • East Gippsland News Weekend
    • Lakes Coast Visitor Guide
    • Great Alpine Road Guide
    • Sapphire Coast
    • Home & Lifestyle
  • Advertising / Contact
    • Display Advertising
    • Classifieds Advertising
    • Trades & Services
    • Submit a News Story
    • Thumbs Up / Thumbs Down
    • Advertise on our Website
    • About
    • Contact
  • Read Our Newspapers

© 2024 James Yeates | All Rights Reserved