122 Nicholson Street, Orbost, VIC 3888 - P: (03) 5154 1919
Wednesday, February 11, 2026
Snowy River Mail
  • Home
  • News
    • Local News
    • Sport
    • Primary Producer
  • Services
    • Order Newspaper Photos
    • Print Your Photos
    • Commercial Printing
  • Our Publications
    • Features
    • Bairnsdale Advertiser
    • Lakes Post
    • East Gippsland News Weekend
    • Lakes Coast Visitor Guide
    • Great Alpine Road Guide
    • Sapphire Coast
    • Home & Lifestyle
  • Advertising / Contact
    • Display Advertising
    • Classifieds Advertising
    • Trades & Services
    • Submit a News Story
    • Thumbs Up / Thumbs Down
    • Advertise on our Website
    • About
    • Contact
  • Read Our Newspapers
No Result
View All Result
  • Home
  • News
    • Local News
    • Sport
    • Primary Producer
  • Services
    • Order Newspaper Photos
    • Print Your Photos
    • Commercial Printing
  • Our Publications
    • Features
    • Bairnsdale Advertiser
    • Lakes Post
    • East Gippsland News Weekend
    • Lakes Coast Visitor Guide
    • Great Alpine Road Guide
    • Sapphire Coast
    • Home & Lifestyle
  • Advertising / Contact
    • Display Advertising
    • Classifieds Advertising
    • Trades & Services
    • Submit a News Story
    • Thumbs Up / Thumbs Down
    • Advertise on our Website
    • About
    • Contact
  • Read Our Newspapers
No Result
View All Result
Snowy River Mail
No Result
View All Result
Home News Local News

Mallacoota powers up

by Snowy River Mail
2 June 2021
in Local News

AusNet Services last Thursday announced it had installed Gippsland’s first community battery in Mallacoota, making the town one of the first in Australia to have a grid-connected energy storage system included in its local network.
This innovative project plays a key role in improving power reliability by up to 90 per cent for the town of Mallacoota. AusNet has contributed $7.5 million for this project which forms part of the Victorian Government’s program announced to improve energy services in bushfire prone areas.
Mallacoota is situated at the end of a 240km radial line from Bairnsdale, via Cann River which means the radial power line coming all the way from Bairnsdale is often exposed to storms, vegetation and wildlife as it traverses over remote landscape and up into the town. 
The elements often contribute to power outages along the radial line which can take time for crews to patrol the remote area to locate and fix the problem before restoring power.
This new large-scale battery, designed as a hybrid system combined with a generator will keep the power running for the town while crews restore problems that occur along the incoming line.
Within the past two weeks since the system was completed it has already operated twice, successfully keeping the power on for the Mallacoota community.
Derek Jayasuriya, principal engineer with AusNet Services, believes the new technology is a solid foundation to build on energy resilience for remote communities, particularly during bushfires.
“Improving energy resilience for the communities we serve, while keeping costs down for Victorians is critical in delivering the best experience for our customers,” he said.
“This innovative solution strikes the right balance, and we are very pleased to be here in Mallacoota today with the community who will be among the first to benefit from this new technology.”
The Mallacoota power storage facility includes a lithium ion battery with a total storage capacity of 1MWh. This could power 1000 average homes for approximately two hours, and up to one day when combined with the generator.
The battery will be charged from the grid and will feed power back into the town during local outages, to lessen the impact of these outages on the Mallacoota community.

IMAGE: AusNet Services’ Derek Jayasuriya, cutting the ribbon to Mallacoota’s new community battery with Tricia Hiley, of Mallacoota Sustainable Energy Group. (Photo: Mary O’Malley, Primal Vision Productions)

ShareTweet
Previous Post

Jabs ready

Next Post

Brewery to relocate

Next Post
Brewery to relocate

Brewery to relocate

Trending

Morton off to the Winter Olympics

Morton off to the Winter Olympics

5 February 2026
Push for proactive fire management

Push for proactive fire management

9 February 2026
Fatty Matty’s Gelato opens in Bairnsdale

Fatty Matty’s Gelato opens in Bairnsdale

20 January 2026
Exploration bid lodged

Exploration bid lodged

5 February 2026
$98,000 boost for native fish habitat

$98,000 boost for native fish habitat

8 February 2026
Deer hunting area expands

Deer hunting area expands

7 February 2026

Popular Stories

Fatty Matty’s Gelato opens in Bairnsdale
Local News

Fatty Matty’s Gelato opens in Bairnsdale

20 January 2026
MP thanks volunteers as crews battle lingering Mallacoota blaze
Local News

MP thanks volunteers as crews battle lingering Mallacoota blaze

21 January 2026
Local News

Woman charged with murder

17 December 2025
Victoria 37 – New South Wales 1
Local News

Victoria 37 – New South Wales 1

24 January 2026

Snowy River Mail

122 Nicholson Street
PO Box 272
Orbost, VIC 3888

P: (03) 5154 1919
F: (03) 5154 2099

Publication Day: Wednesday
Circulation: 3,531

James Yeates

65 Macleod Street
PO Box 465
Bairnsdale, VIC 3875

P: (03) 5152 4141
F: (03) 5152 6257

© 2024 James Yeates

No Result
View All Result
  • Home
  • News
    • Local News
    • Sport
    • Primary Producer
  • Services
    • Order Newspaper Photos
    • Print Your Photos
    • Commercial Printing
  • Our Publications
    • Features
    • Bairnsdale Advertiser
    • Lakes Post
    • East Gippsland News Weekend
    • Lakes Coast Visitor Guide
    • Great Alpine Road Guide
    • Sapphire Coast
    • Home & Lifestyle
  • Advertising / Contact
    • Display Advertising
    • Classifieds Advertising
    • Trades & Services
    • Submit a News Story
    • Thumbs Up / Thumbs Down
    • Advertise on our Website
    • About
    • Contact
  • Read Our Newspapers

© 2024 James Yeates | All Rights Reserved